Building work is nearing
completition at our new studio complex at Bury House in Gosport,
which is where we will move in to when we vacate our current
home at Radio House. |
|
You now have the
opportunity to see the progress with us as we will post
regular updates online.
(Please note that all photos on this page
remain the property of Radio Haslar and may not be copied or
re-produced without prior consent, which can be obtained by
emailing
webmaster@radiohaslar.co.uk) |
|
11th November 2008 |
|
 |
 |
|
Studio 1 almost complete
with carpet having just been laid and the doors hung |
View from studio 1 looking
with the window showing studio 2 |
 |
 |
|
The new ceiling in studio 1
with the external window visible |
Looking through the door of
studio 1 into the corridor, the entrance to studio 2 is
visible on the left hand side |
 |
 |
|
The mass of cables needed
for all the studio equipment and data from the racks room |
Looking in to studio 2
which is also almost complete though at the moment being
used for temporary storage |
|
 |
 |
|
Looking from studio 2 out
towards the main corridor between the two studios |
Looking through the
partition window from studio 2 in to studio 1 |
|
|
|
|
|
|
|
|
|
|
|
|